StormTech – Woolworths Car Park

EMERALD QLD – North-Eastern Australia – Lined Detention – 5,000m3 Installation date: May 2011 GENERAL PROJECT INFORMATION
  • New supermarket – Emerald, North-Eastern Australia
  • Heavy seasonal rainfall
  • Significant inflows
  • Constant traffic over the tank
  • Services and light poles intersecting the tank
  • Extreme heat conditions in summer months
DESIGN CONSIDERATIONS
  • 5,000m3 volume in one single tank
  • 12 inlets for a peak inflow of over 12m3 /s
  • Reactive clay site; fully lined tank
  • Structural assessment for constant heavy traffic
  • Structurally verified for emergency vehicle access (fire trucks)
DESIGN STANDARDS 
  • The Stormtech tank had to comply with AS5100.1 (bridge design – loads standard), AS4678 (retaining wall standard) and AS2041.1 (culverts standard).
  • Compliance with local Queensland standards and independent verification.
  • The Australian Road Research Board (ARRB) structurally assessed and approved the product.
  • Isolator Rows required to comply with local environmental regulations and meet minimum water quality standards.
\"stormtech\"

Stay informed

News | Events | Updates

You can constantly keep up to date by visiting our news pages but for added convenience why not join our mailing list and have it delivered to your inbox.

Scroll to Top